From vision to foundation to finished home
One team for the site, the design, the permits and the build.


End-to-end development
One team, responsible for the entire journey
Site, architecture, budget, approvals, materials and construction all influence one another. We treat them as one connected process, and we know where complexity tends to appear before it becomes a problem.
Four stages

01 Site evaluation
Location, constraints, access, zoning and your ambitions set the direction.

02 Design
Architecture, consultants, budget, schedule and materials, so we start with clarity.

03 Construction
Permits and building managed for quality, sequencing, cost and progress.

04 Handover
Finishes resolved, details inspected, the home prepared for you.
Before you start
Most ground-up Reeland projects in Manhattan Beach take 12 to 20 months from permit issuance, depending on design complexity and city review timelines.
Yes. Reeland is a California licensed general contractor, so the same team that evaluates your site and manages the design also builds the home.
Cost depends on the lot, the size of the home, the design and the level of finish. We give you a realistic budget after the site evaluation, before anyone commits.
Often, yes. Several of our homes under construction can be reserved before completion. Ask the team which homes are available and at what stage.
It starts with a site evaluation
Have a lot?
We look at zoning, setbacks, buildable size and view potential before anyone commits.